• Accredited as an Investor in Diversity 2011
  • Reducing our carbon footprint by 5% annually
  • Five Times LABC Built in Quality Award Winner 2011
  • Housing Excellence Regeneration Scheme of the Year 2011
  • Investor in People Accredited
  • 2011 ROSPA Bronze Award Winner for Health and Safety
  • Voted as a Best Company to Work for 2011, 2010 and 2009
  • Working Towards Investors in Diversity 2011
  • Health and Safety OHSAS 18001 Accredited
  • Positive About Disabled People Accredited Organisation
  • Environmental ISO14001 Accredited
  • Quality Assurance ISO9001 2008 Accredited
  • £72m Group Turnover in 2010
  • CSCS Certified in house test centre
  • CSCS Platinum status - over 90% of our staff are registered
  • 10% of our workforce are Apprentice and Trainees
  • Over 340 skilled and qualified construction professionals employed
  • Dedicated staff volunteering scheme, Escalate in the Community
Friday 15th July 2011

Nimans Limited, Agecroft, Salford


Nimans Limited, Agecroft, Salford PictureNimans Limited, Agecroft, Salford PictureNimans Limited, Agecroft, Salford Picture

This prestigious £4.2 million project provided Nimans Ltd with 2,064m2 of high quality offices and 2,886m2 of warehousing space.

Construction comprised vibro-piling to a depth of 4.5 metres, and mass reinforced concrete foundations, incorporating ground beams and power floated concrete floor slabs - laser screeded.

The superstructures comprised structural steel frames with the warehouse clad in 'goosewing grey' plastisol coated Kingspan HP400 composite panels, with the three-storey offices in Senior Aluminium Systems full curtain walling, featuring graded Pilkington 'K' Glass to allow the creation of an internal cool environment.

Roofs were finished in Kingspan KS1000 insulated roof panels with the offices featuring additional thermal barriers.

Additional features in the warehouse included a customer reception area, high security escape doors, four roller shutter doors with integrated loading bays and modern dock handling systems.

The offices featured a spacious reception with ceramic tiled floors and semi-circular hardwood reception desk. Each floor was laid out in a modern, open plan arrangement, with raised computer floors, suspended ceilings, proprietary glazed partitions and ash and iroko hardwood doors.

Core M & E services included full air-conditioning throughout, multiple-level security systems including twenty four CCTV cameras, and a six person passenger lift.

A mixture of hard and soft landscaping incorporating block paviored pathways, six hundred space tarmac car park areas, perimeter security fencing, and a security gatehouse completed the 56 week development.