• Accredited as an Investor in Diversity 2011
  • Reducing our carbon footprint by 5% annually
  • Five Times LABC Built in Quality Award Winner 2011
  • Housing Excellence Regeneration Scheme of the Year 2011
  • Investor in People Accredited
  • 2011 ROSPA Bronze Award Winner for Health and Safety
  • Voted as a Best Company to Work for 2011, 2010 and 2009
  • Working Towards Investors in Diversity 2011
  • Health and Safety OHSAS 18001 Accredited
  • Positive About Disabled People Accredited Organisation
  • Environmental ISO14001 Accredited
  • Quality Assurance ISO9001 2008 Accredited
  • £72m Group Turnover in 2010
  • CSCS Certified in house test centre
  • CSCS Platinum status - over 90% of our staff are registered
  • 10% of our workforce are Apprentice and Trainees
  • Over 340 skilled and qualified construction professionals employed
  • Dedicated staff volunteering scheme, Escalate in the Community
Monday 25th July 2011

Reeve Court Extracare Village, St Helens


Reeve Court Extracare Village, St Helens PictureReeve Court Extracare Village, St Helens PictureReeve Court Extracare Village, St Helens Picture

"Cruden Group has worked for Arena Housing Group (the former Liver Housing and Grosvenor Housing) for over 20 years. They are valued members of our Engage 360 Framework, and have worked with us on many successful projects."

 

Claire Griffiths, Director of Development, Arena Housing Association

 

This £16.4 million project, the second design and build extracare village completed for the partnership of Arena Housing Association and The Extracare Charitable Trust provided the very highest standards of affordable, blind tenure housing for the over 55's.

In total the scheme consists of 174 self contained flats, 32 bungalows and a village centre, built on an 8.74 acre site. The village includes a village hall, a restaurant, bar and café, health and fitness studio, hairdressing salon, a 'well-being' centre, a steam room, jacuzzi/spa pool, rest room, IT centre, village shop, winter garden, craft and hobby room and a library and reading room.

The project was completed in just eighty weeks. Construction comprised piling to a depth of eight metres to support the winter garden, mass reinforced concrete strip foundations and extensive drainage systems. Superstructures comprised a combination of traditional load bearing construction and steel frame. The external façade of the building is facing brickwork with high level rendered panels and double glazed windows.

All accommodation meets 'Lifetime Homes' standard with fitted kitchens, bathrooms with level access showers, comfortable lounges, temperature controlled hot water, low surface temperature radiators and gas central heating from a central plant room. Extra wide swing doors aid mobility for wheelchair or walking frame users and the scheme meets the applicable requirements of access for disabled people. The accommodation incorporates SMART Technology: safety, security and fire features such as CCTV cameras access control, security alarm, intelligent fire alarm and emergency call systems.

The design fully responds to 'Secure by Design' criteria.